Data center migration

Why would I need to migrate my datacenter?

Migrating a data center, also known as data center relocation or data center migration services, is an essential process for companies that want to improve their IT infrastructure, reduce costs, and increase efficiency. There are several reasons why companies may need to migrate their data center, some of the most common reasons include:

  1. Hybrid cloud capabilities: A direct link to a public cloud is crucial for companies that want to take advantage of the benefits of a hybrid cloud environment. Without this, it can be difficult for companies to effectively utilize cloud technology.
  2. Lack of space: As a business grows, it may require more space for IT equipment and infrastructure. A data center migration can help companies to move to a location with more space.
  3. Cost savings: A data center migration can help companies to reduce costs by moving to a more cost-effective location or by taking advantage of new technologies that can help to improve efficiency.
  4. Hardware refresh: As technology evolves, it is important to keep hardware up-to-date. A data center migration can help companies to replace old hardware and improve performance.
  5. Improved design: A data center migration can also help to improve the overall design and layout of a data center, which can help to improve performance and efficiency.
  6. Power and cooling issues: Power and cooling problems can cause downtime and reduce the lifespan of IT equipment. A data center migration can help to address these issues by moving to a location with better power and cooling infrastructure.

Data center services providers can offer a range of solutions and services to assist with a migration, including assessment, planning, execution, and ongoing support. This can help to ensure that the migration is completed smoothly and with minimal disruption to business operations. With the help of professional data center migration services, companies can ensure that their IT infrastructure is running efficiently and effectively.

Some background of the process

Data center modernization is a complex process that requires a great deal of planning, execution, and ongoing support. It involves updating and upgrading various aspects of a data center, such as hardware, software, power and cooling systems, and overall design. This process can be time-consuming and require a significant investment of resources, which is why it is important to work with experienced professionals.

AV5 is a professional data center services provider that can help you navigate the modernization process. They have the expertise and experience necessary to assess your current data center infrastructure, identify areas for improvement, and develop a plan for modernization that meets your specific needs. They can also help you with the execution of the plan, ensuring that the modernization is completed smoothly and with minimal disruption to your business operations.

By working with AV5, you can enjoy the benefits of enormous savings and optimized data center performance without the stress and hassle of managing the modernization process yourself. They will work with you every step of the way to ensure that your data center is modernized to meet your specific needs, and that the end result is a data center that is more efficient, reliable, and cost-effective.

In summary, Data Center Modernization is a complicated and extensive process which is best handled by professional data center services provider like AV5. With their expertise and experience, they can help you modernize your data center, optimize performance and reduce costs.

Lets start. The first step.

Data center migration is a complex process that requires careful planning and execution to ensure that the migration is successful. The first step in the process is to conduct a business analysis of the current data center. This includes evaluating factors such as cooling and power capacity, location, carrier options, and the ability to expand as needed. Additionally, it is important to consider the data center’s resilience to natural disasters. This information will help identify areas that need to be addressed during the migration process and allow for the development of a plan that meets the needs of the business both now and in the future.

Once the analysis is complete, the next step is to build financial reports that outline the current contract and migration costs, as well as the potential impact on the business. This information can then be used to make informed decisions about the future of the data center and the company as a whole.

It is important to consider the potential impact of the migration on the business, as well as the cost of migration and the potential savings from a new data center. Additionally, you will want to consider the location of your customers and the optimal carriers to use for the migration. It is also important to consider the data center provider’s capacity for future expansions and the data center’s resilience to natural disasters.

Overall, conducting a thorough business analysis of your current data center is a crucial first step in the data center migration process. This will allow you to identify areas that need to be addressed, develop a plan that meets the needs of the business, and make informed decisions about the future of the data center.

Step 2. Design your datacenter.

Data center migration process involves designing your new data center and core network. This includes creating a plan for the installation of racks, power distribution units, and designing the footprint and power structure of the new data center. The design of the core network structure, including detailed plans for power, servers, and network installations, is also critical.

Once the racks are installed, it’s time to install the core network, which includes running copper and fiber cables. The network structure will depend on the budget, goals and possible habits of the organization. The options for network structure include Distribution core switches and Top of Rack (ToR) switches, Core switches and fabric extenders, and Chassis design with mixes of switches. Our network engineers will work with your engineers on every step of the migration. A detailed schedule will be made to migrate or install your servers, depending on your servers’ data flow to minimize impact of the migration process.

Additionally, there is an optional step of interconnecting the data centers. This is typically done when reallocating the data center, as it is a long process and components of enterprise application still need to talk to each other during the migration process. We can connect the old and new data centers to each other using WAN, LAN, MPLS technologies to organize temporal wide network covering both data centers. Once migration is over, this network can be disassembled. This step reduces the possible impact on your business.

Step 3. Preparation.

Step 3 of the data center migration process is preparation, which includes creating a detailed schedule to migrate or install your servers. This schedule will take into account the data flow of the servers to minimize the impact of the migration process.

One important aspect of this step is to create a Work Break Structure (WBS) and schedule. This step is one of the most complicated and requires all project managers, network and infrastructure engineers to be on board and work as a single brain. The WBS is a hierarchical representation of the work that needs to be done, broken down into smaller, manageable tasks. The schedule outlines the timeline for the completion of these tasks. Depending on the design of your applications, we can assist your project managers to design roll-back steps, or alternative for each small step of the map.

Step 4. Migration.

Step 4 of the data center migration process is the actual migration or installation of the new data center. This includes building the infrastructure in the new data center and installing all necessary servers and related hardware.

The first step in this process is to make a very detailed schedule for the installation of the servers and related hardware. This schedule takes into account the data flow of the servers and other factors to minimize the impact of the migration process on your business.

The servers and related hardware that need to be installed include network switches, backup servers, CPU-intensive servers, storage servers, and GPU servers for AI. Our experienced data center technicians can install or migrate your servers, while our infrastructure engineers can perform the initial configuration for you or work with your engineers.

To ensure that your equipment is transported safely and securely, we work with a few professional transportation companies that are experienced in packing and transporting data center equipment. These companies are equipped with the necessary tools and skills to ensure that your equipment arrives at the new data center in the same condition as it left the old one.

During this step, it’s crucial to have a well-defined plan, schedules and procedures in place to ensure a smooth and efficient migration. Additionally, it’s important to have a well-trained team with proper knowledge of the process, the equipment and the possible issues that may arise.

Step 5. Post-installation procedures.

Step 5 of the data center migration process is the post-installation procedure. This includes building documentation, monitoring the data center, and disposing of old equipment.

The first step in this process is to build documentation for the new data center. This includes creating detailed maps of the racks and the network, as well as documenting IP configurations and access information. Building documentation is one of the most important, but also one of the most tedious tasks. However, it will be very helpful in the future, especially when you run the data center for years. Additionally, we can build IT assets database so that you can always know what you have installed, their lifetime, and part numbers if you need a replacement.

Monitoring the data center is another important aspect of this step. Electronic components can fail, and it is critical to have proper monitoring in place to detect any potential problems immediately and take further action. We can monitor temperature and humidity inside of your cage(s), voltage and components of each server and network equipment. We can set up a monitoring system and, even more, provide 24/7 support for your business.

Finally, disposing of old equipment is an important step. At this point, we work with your taxation department so that disposing of hardware is reflected in your tax report. We will work with one of our partners to recycle your old equipment, ensuring that it is disposed of in an environmentally-friendly manner.

Overall, the post-installation procedure is a crucial step in the data center migration process. It ensures that the data center is properly documented, monitored and maintained, minimizing the risk of any issues, and maximizing the uptime of the data center.